Manual No. 0-2744July 26, 1999Operating ManualA-02464Air Plasma CuttingPower Supply
GENERAL INFORMATION 4 Date 6/22/99• Les sortes de gaz et de fumée provenant de l’arc deplasma dépendent du genre de métal utilisé, desrevêtements se t
Date: 6/22/99 5 GENERAL INFORMATION• Utilisez la nuance de lentille qui est suggèrée dansle recommendation qui suivent ANSI/ASC Z49.1:Nuance Minimum
GENERAL INFORMATION 6 Date 6/22/9914. Norme AWSF4.1 de l’Association Américaine deSoudage, RECOMMANDATIONS DE PRA-TIQUES SURES POUR LA PRÉPARATION À
Date: 6/22/99 7 GENERAL INFORMATION1.07 Declaration of ConformityManufacturer: Thermal Dynamics CorporationAddress: Industrial Park #2West Lebanon, N
GENERAL INFORMATION 8 Date 6/22/991.08 Statement of WarrantyLIMITED WARRANTY: Thermal Dynamics® Corporation (hereinafter “Thermal”) warrants that it
Manual 0-2744 9 SECTION 2: INTRODUCTIONSECTION 2:INTRODUCTION2.01 Scope of ManualThis manual contains descriptions, operating instructionsand basic m
SECTION 2: INTRODUCTION 10 Manual 0-274410. Overall DimensionsOverall dimensions are with handle, leads wrapbracket, and Gas Regulator/Filter Assembl
Manual 0-2744 11 SECTION 3: INSTALLATION PROCEDURESSECTION 3:INSTALLATIONPROCEDURES3.01 IntroductionNOTEDepending on how the system was ordered, some
SECTION 3: INSTALLATION PROCEDURES 12 Manual 0-2744• If using a fork lift vehicle, place and secure unit on aproper skid before transporting.• This
Manual 0-2744 13 SECTION 3: INSTALLATION PROCEDURESMove the power selection plug to the desired input con-nection for 208/230/240V, 380/415V, or 460V
WARNINGWARNINGRead and understand this entire manual and your employer’ssafety practices before installing, operating, orservicing the equipment.While
SECTION 3: INSTALLATION PROCEDURES 14 Manual 0-2744a. Locate the ground stud and remove the top nutand washer.b. Install a lug terminal on the groun
Manual 0-2744 15 SECTION 3: INSTALLATION PROCEDURESD. Optional Air Line Filter InstallationAdditional filtering is recommended when using air froma c
SECTION 3: INSTALLATION PROCEDURES 16 Manual 0-2744AccessPanelScrewLatchA-02467Figure 3-9 Front Access Panel2. Lift up on the access panel to gain a
Manual 0-2744 17 SECTION 3: INSTALLATION PROCEDURESoff energy, which causes difficult starting and in-creased chance of RF interference.5. Make sure
SECTION 3: INSTALLATION PROCEDURES 18 Manual 0-2744
Manual 0-2744 19 SECTION 4: OPERATIONSECTION 4:OPERATION4.01 IntroductionThis section provides a description of the Power Supplyoperating controls an
SECTION 4: OPERATION 20 Manual 0-27444. AC Power IndicatorGreen LED indicator will blink ON then OFF for ap-proximately eight seconds and then stay O
Manual 0-2744 21 SECTION 4: OPERATION3. Gas Pressure Regulator/Filter AssemblyPressure regulator to adjust the input gas pressure tothe Power Supply.
SECTION 4: OPERATION 22 Manual 0-2744a. Gas flow stops.b. GAS indicator turns OFF.6. Protect eyes and press or activate torch switcha. Gas pre-flo
Manual 0-2744 23 SECTION 4: OPERATIONB. Check primary power source as follows:1. Check the power source for proper input voltage. Makesure the inpu
Purchase DatePower SupplyTorchRecord Serial Numbers For Warranty Purposes
SECTION 4: OPERATION 24 Manual 0-2744Kerf WidthThe width of material removed during the cut.Nitride Build-upNitride deposits which may remain on the s
Manual 0-2744 25 SECTION 5: SERVICESECTION 5:CUSTOMER/OPERATORSERVICE5.01 IntroductionThis section describes basic maintenance procedures per-formabl
SECTION 5: SERVICE 26 Manual 0-2744A-02476FilterElementHousingCoverBarbedFittingSpringAssembled FilterFigure 5-1 Optional Dry Air Filter Replacement3
Manual 0-2744 27 SECTION 5: SERVICERight SideCut AngleLeft SideCut AngleA-00512Figure 5-2 Side Characteristics Of CutE. DrossGenerally when dross is
SECTION 5: SERVICE 28 Manual 0-27441. Cause (Italic Type)a. Check/Remedy (Text Type)Locate your symptom, check the causes (easiest listed first)then
Manual 0-2744 29 SECTION 5: SERVICE3. Faulty components in unita. Return for repair or have qualified technicianrepair per Service Manual.G. Erract
SECTION 5: SERVICE 30 Manual 0-2744B. Fuse Replacement1. Remove the left side panel per paragraph "A"above.2. Locate the internal fuse ab
Manual 0-2744 31 SECTION 6: PARTS LISTSSECTION 6:PARTS LISTS6.01 IntroductionA. Parts List BreakdownThe parts list provide a breakdown of all replac
SECTION 6: PARTS LISTS 32 Manual 0-27446.03 Complete Power Supply ReplacementPower Supply includes: work cable and clamp, pressure regulator/air fil
Manual 0-2744 33 APPENDIXAPPENDIX I: INPUT WIRING REQUIREMENTSInput Power Input Current Input Suggested Sizes (See Notes)Voltage Freq. 1-Ph 3-Ph 1-Ph
APPENDIX 34 Manual 0-2744APPENDIX II: SEQUENCE OF OPERATION(BLOCK DIAGRAM)ACTIONON/OFF switchto OFFRESULTAll indicators off.Power supply fans off.AC
Manual 0-2744 35 APPENDIXThis page blank
APPENDIX 36 Manual 0-2744A-02503913 16J21J20J19GASSOLGASINRUSHINRUSH
Manual 0-2744 37 APPENDIXA-02503OKOK TOMOVE8/11/99
APPENDIX 38 Manual 0-2744
TABLE OF CONTENTSSECTION 1:GENERAL INFORMATION ... 11.0
TABLE OF CONTENTS (continued)SECTION 6:PARTS LISTS...
Date: 6/22/99 1 GENERAL INFORMATIONSECTION 1:GENERAL INFORMATION1.01 Notes, Cautions and WarningsThroughout this manual, notes, cautions, and warning
GENERAL INFORMATION 2 Date 6/22/99• Install and maintain equipment according to NECcode, refer to item 9 in Subsection 1.03, Publica-tions.• Disconnec
Date: 6/22/99 3 GENERAL INFORMATION8. NFPA Standard 51, OXYGEN-FUEL GAS SYSTEMSFOR WELDING, CUTTING AND ALLIED PRO-CESSES, obtainable from the Nation
Commentaires sur ces manuels